The last House walls to be plastered
The outside of the large arch area was plastered. This is accessed by a roof hatch on the landing, to stand on the ceiling of the new bedrooms. Looking through the windows you can see into the master bedroom (the original ‘gallery’). Again Paul and Chad did an excellent job of creating a neat edge butting up to the decorative arch without plastering over parts of it.
The bathroom was also plastered. The day we can have a long soak in the bath is a little nearer now!
Standing in the bathroom, you can see the bath… waiting… housed on the landing.
However the downside of this excellent progress is that my ‘to paint’ list has grown *sigh*